Where is it easiest to open: Nuclear Electric Power Generation

13 states, side by side. Operator counts and wages from Census and BLS; licence records matched on “SOC 17-2071” (soc) for Electrical Engineers. A blank gate means NO RECORD MATCHED, which is not the same as no licence.

StateOperatorsAvg staffPay / employeeGateLicence titles matched
IL18209.9$138,095licenceENGINEER, INTERN; ENGINEER, PROFESSIONAL
FL1428.6$107,596licenceEngineering Intern; Professional Engineer
MS7194.9$154,964examEngineer Intern; Professional Engineer
MI7232.6$135,016examEngineer, Licensed Professional; Stationary Engineer
NY61.3$74,625examProfessional Engineer
NC6233.3$137,719examEngineer Privilege; Professional Engineer
PA6297.8$128,698examProfessional Engineer
VT50.6$40,333examProfessional Engineer
NJ4407.2$146,637examENGINEER-IN-TRAINING; PROFESSIONAL ENGINEER
VA3247.3$140,644examEngineer, Professional License
WI3156.3$154,578examDESIGNER OF ENGINEERING SYSTEMS - Elec; DESIGNER OF ENGINEERING SYSTEMS - HVAC
SC3196.7$132,549licenceEngineer Construction Manager; Engineering and Land Surveying
IA316.0$105,333not matched—

Axes are shown side by side and deliberately NOT collapsed into a ranking. A composite would be a score with no measured interval, and an unmeasured score is the thing this product exists to argue against. A high licence gate is a cost to enter and a moat once cleared — which of those matters more is the operator's call, not ours.