Tool · free, no account

Where is it easiest to open: Solar Electric Power Generation

24 states, side by side. Operator counts and wages from Census and BLS; licence records matched on “SOC 47-2231” (soc) for Solar Photovoltaic Installers. A blank gate means NO RECORD MATCHED, which is not the same as no licence.

StateOperatorsAvg staffPay / employeeGateLicence titles matched
CA18414.7$150,370licenceSolar Contractor
FL671.9$84,000licenceCertified Solar Contractor
TX4026.1$128,391not matched—
CO2512.2$175,601not matched—
AZ2126.8$120,831not matched—
NY2019.9$210,541not matched—
NC1741.3$138,160not matched—
UT1711.2$75,885not matched—
NJ159.7$114,158not matched—
MA1438.1$150,066not matched—
IL116.4$134,529not matched—
VA1111.0$165,810not matched—
NV95.3$128,833not matched—
GA85.0$216,025not matched—
MD86.4$112,118not matched—
HI71.9$87,385not matched—
DC63.7$159,455not matched—
DE60.8$60,000not matched—
CT514.4$177,500examElectrical Limited Solar Contractor; Electrical Limited Solar Journeyperson
MN42.0$139,625not matched—
ID37.3$77,045not matched—
SC35.7$126,588not matched—
TN3——not matched—
NM311.0$42,515not matched—

Axes are shown side by side and deliberately NOT collapsed into a ranking. A composite would be a score with no measured interval, and an unmeasured score is the thing this product exists to argue against. A high licence gate is a cost to enter and a moat once cleared — which of those matters more is the operator's call, not ours.

Licence data courtesy of CareerOneStop, sponsored by the U.S. Department of Labor. Free to read, no account, always — a condition of the data licence as well as our own position.