Tool · free, no account

Where is it easiest to open: Electric Bulk Power Transmission and Control

15 states, side by side. Operator counts and wages from Census and BLS; licence records matched on “SOC 17-2071” (soc) for Electrical Engineers. A blank gate means NO RECORD MATCHED, which is not the same as no licence.

StateOperatorsAvg staffPay / employeeGateLicence titles matched
TX2824.3$150,399licenceENGINEER, PROFESSIONAL; PODIATRIST
IL1864.3$194,748licenceENGINEER, INTERN; ENGINEER, PROFESSIONAL
OH15128.6$272,105licenceProfessional Engineer; Professional Engineers and Surveyors
ME1555.9$119,894examEngineer, Professional (All Discipline
PA1481.3$178,446examProfessional Engineer
LA933.0$118,444examEngineer, Professional
DC67.5$284,556licencePROFESSIONAL ENGINEERS
CT51.2$84,833examEngineer-in-training; Professional Engineer
WV48.8$110,771not matched—
DE415.2$67,230examEngineer, Professional
MD41.0$34,500licenceENGINEER IN TRAINING; PE FIRM CORPORATION
NC48.5$132,882examEngineer Privilege; Professional Engineer
AR4194.2$149,826examEngineer Intern; Professional Engineer
MS392.3$140,736examEngineer Intern; Professional Engineer
OK322.0$104,924examEngineer Intern; Engineer, Licensed Professional, Elect

Axes are shown side by side and deliberately NOT collapsed into a ranking. A composite would be a score with no measured interval, and an unmeasured score is the thing this product exists to argue against. A high licence gate is a cost to enter and a moat once cleared — which of those matters more is the operator's call, not ours.

Licence data courtesy of CareerOneStop, sponsored by the U.S. Department of Labor. Free to read, no account, always — a condition of the data licence as well as our own position.