Tool · free, no account

Where is it easiest to open: Framing Contractors

50 states, side by side. Operator counts and wages from Census and BLS; licence records matched on “SOC 47-1011” (soc) for First-Line Supervisors of Construction Trades and Extraction Workers. A blank gate means NO RECORD MATCHED, which is not the same as no licence.

StateOperatorsAvg staffPay / employeeGateLicence titles matched
CA97021.0$61,492licencePile Driving/Pressure Foundation Jacki; Solar Contractor
FL8215.3$45,429examCertified Solar Contractor; Certified Utility & Excavation Contrac
WA7297.3$60,980licenceMining Engineer
TX5566.6$69,094not matched—
NY5444.3$56,962not matched—
ID5165.1$43,869not matched—
CO4813.5$62,003not matched—
UT4655.7$45,102not matched—
NC3863.0$59,177licenceMining
MN3726.9$57,949not matched—
MA3333.8$59,559not matched—
IL3288.6$66,044licenceFOREMAN; GENERAL SURFACE SUPERVISOR
PA2914.6$59,798licenceAsbestos Supervisor
MI2795.2$52,678not matched—
VA2755.2$55,144not matched—
OH2646.9$60,036not matched—
WI2636.7$57,392licenceUTILITY CONTRACTOR
NJ2515.1$67,201not matched—
OR2456.7$57,629licenceApprentice Plumber (Speciality), Solar
IN2415.3$51,346not matched—
AZ22117.4$64,261not matched—
MT1913.7$48,677licenceSurface Coal Mining Blasters
NE1824.5$48,578licenceMining & Mineral Engineer
MO1807.6$55,930not matched—
GA1723.3$65,359examUtility Contractor; Utility Foreman
MD1566.5$63,362not matched—
IA1544.7$54,214not matched—
SC1352.7$66,794not matched—
KS1194.5$46,476not matched—
TN1023.5$54,239not matched—
NH925.8$66,596not matched—
NV8841.5$55,911not matched—
SD805.0$52,885not matched—
OK703.1$41,628licenceMine Fire Boss (Underground); Mine Foreman (Underground)
CT707.0$66,546examElectrical Limited Solar Contractor; Electrical Limited Solar Journeyperson
ND674.6$59,395not matched—
KY675.7$43,478examAssistant Mine Foreman; Certified Surface Miner
ME642.3$46,477not matched—
AK603.4$50,647licenceEngineer- Chemical, Civil, Electrical,
VT573.7$49,777examAsbestos Supervisor; Contractor, Residential
AL523.7$46,057not matched—
WY473.2$68,539not matched—
RI469.9$77,430not matched—
DE406.4$64,735not matched—
LA343.9$55,045not matched—
NM348.3$42,527not matched—
AR292.9$43,524not matched—
HI1733.9$75,504not matched—
MS92.3$43,857not matched—
WV73.7$18,115not matched—

Axes are shown side by side and deliberately NOT collapsed into a ranking. A composite would be a score with no measured interval, and an unmeasured score is the thing this product exists to argue against. A high licence gate is a cost to enter and a moat once cleared — which of those matters more is the operator's call, not ours.

Licence data courtesy of CareerOneStop, sponsored by the U.S. Department of Labor. Free to read, no account, always — a condition of the data licence as well as our own position.