Tool · free, no account

Where is it easiest to open: Siding Contractors

50 states, side by side. Operator counts and wages from Census and BLS; licence records matched on “SOC 47-1011” (soc) for First-Line Supervisors of Construction Trades and Extraction Workers. A blank gate means NO RECORD MATCHED, which is not the same as no licence.

StateOperatorsAvg staffPay / employeeGateLicence titles matched
WA6164.9$65,389licenceMining Engineer
FL6104.2$50,354examCertified Solar Contractor; Certified Utility & Excavation Contrac
NY4483.5$55,556not matched—
IL4413.6$64,500licenceFOREMAN; GENERAL SURFACE SUPERVISOR
MN3993.8$69,024not matched—
NC3414.1$53,036licenceMining
WI3154.9$58,014licenceUTILITY CONTRACTOR
CA2928.2$61,451licencePile Driving/Pressure Foundation Jacki; Solar Contractor
PA2675.2$62,771licenceAsbestos Supervisor
NJ2573.4$58,868not matched—
OR2467.5$63,640licenceApprentice Plumber (Speciality), Solar
TX2406.7$70,321not matched—
VA2314.3$58,892not matched—
MA2283.1$63,113not matched—
OH2254.5$61,057not matched—
ID2234.4$42,964not matched—
MI2145.9$71,233not matched—
MO2114.9$57,885not matched—
CO1873.7$60,747not matched—
UT1777.8$48,730not matched—
GA1776.1$69,711examUtility Contractor; Utility Foreman
IN1413.9$50,313not matched—
NE1363.3$48,298licenceMining & Mineral Engineer
SC1355.3$55,124not matched—
TN1185.6$67,700not matched—
IA1113.8$65,297not matched—
MT1012.8$51,371licenceSurface Coal Mining Blasters
MD1014.0$64,240not matched—
KS714.4$56,205not matched—
AL704.1$65,249not matched—
CT634.3$75,266examElectrical Limited Solar Contractor; Electrical Limited Solar Journeyperson
AR623.5$57,553not matched—
OK574.3$66,032licenceMine Fire Boss (Underground); Mine Foreman (Underground)
SD573.6$57,415not matched—
LA573.3$47,011not matched—
NH563.9$56,579not matched—
KY555.7$57,631examAssistant Mine Foreman; Certified Surface Miner
ND536.2$65,620not matched—
RI393.6$68,899not matched—
DE353.2$56,814not matched—
ME273.4$65,088not matched—
AK244.0$75,389licenceEngineer- Chemical, Civil, Electrical,
AZ237.8$65,428not matched—
WY198.7$51,078not matched—
NV1735.6$21,055not matched—
VT152.3$96,088examAsbestos Supervisor; Contractor, Residential
MS133.3$40,488not matched—
WV125.2$37,242not matched—
HI96.3$94,965not matched—
NM511.0$33,345not matched—

Axes are shown side by side and deliberately NOT collapsed into a ranking. A composite would be a score with no measured interval, and an unmeasured score is the thing this product exists to argue against. A high licence gate is a cost to enter and a moat once cleared — which of those matters more is the operator's call, not ours.

Licence data courtesy of CareerOneStop, sponsored by the U.S. Department of Labor. Free to read, no account, always — a condition of the data licence as well as our own position.