Tool · free, no account

Where is it easiest to open: Power, Distribution, and Specialty Transformer Manufacturing

8 states, side by side. Operator counts and wages from Census and BLS; licence records matched on “SOC 17-2071” (soc) for Electrical Engineers. A blank gate means NO RECORD MATCHED, which is not the same as no licence.

StateOperatorsAvg staffPay / employeeGateLicence titles matched
CA1135.5$66,205licenceElectrical Engineer; Engineer In Training (E.I.T.)
IL977.1$79,605licenceENGINEER, INTERN; ENGINEER, PROFESSIONAL
TX752.1$81,762licenceENGINEER, PROFESSIONAL; PODIATRIST
MA4106.0$99,153examENGINEER-IN-TRAINING; ENGINEER, PROFESSIONAL
WI3369.7$77,164examDESIGNER OF ENGINEERING SYSTEMS - Elec; DESIGNER OF ENGINEERING SYSTEMS - HVAC
MS31324.3$52,330examEngineer Intern; Professional Engineer
PA3115.0$74,461examProfessional Engineer
UT36.3$56,158licencePROFESSIONAL ENGINEER

Axes are shown side by side and deliberately NOT collapsed into a ranking. A composite would be a score with no measured interval, and an unmeasured score is the thing this product exists to argue against. A high licence gate is a cost to enter and a moat once cleared — which of those matters more is the operator's call, not ours.

Licence data courtesy of CareerOneStop, sponsored by the U.S. Department of Labor. Free to read, no account, always — a condition of the data licence as well as our own position.